Turnkey Fleet Electrification

Commercial EV charging infrastructure engineered for scale

US EV Charger delivers medium-voltage switchgear, civil trenching, and 350kW DC fast chargers for national fleet depots and commercial real estate.

Operational Standards

Utility-grade performance criteria

97%

telemetry-monitored uptime SLA

45 Days

average AHJ permit turnaround

350 kW

continuous DC output per port

Integrated Services

End-to-end grid deployment

From medium-voltage utility tie-ins to continuous telemetry management, our engineering teams oversee every stage of capital electrification.

Civil Engineering
Hardware Tier
Funding Support

480V Interconnect Trenching

High-Output DCFC Dispensers

NEVI Program Administration

Dedicated medium-voltage transformers, concrete pad pours, and directional boring engineered to local utility interconnect standards.

Liquid-cooled 150kW to 350kW dual-port dispensers supporting ISO 15118 Plug and Charge protocols across mixed commercial fleets.

Turnkey federal grant compliance documentation, utility rebate capture, and Buy America certification management for all project sites.

Structured Rollout

Four-stage execution protocol

01
02
03
04

Grid Feasibility Assessment

AHJ Permitting and Interconnect

Turnkey Civil Construction

Telemetry SLA Activation

On-site electrical load calculation, transformer capacity verification, and preliminary utility service point coordination.

Trenching, conduit routing, switchgear landing, dispenser commissioning, and local inspector sign-off.

Automated OCPP network integration, power-sharing balancing, and 24-hour hardware dispatch monitoring.

Stamped electrical schematics submitted to local jurisdictions and power companies to secure distribution approvals.

Commission site grid assessment

Submit your parcel coordinates or depot electrical schematics. Our utility engineers deliver a full capacity report within ten business days.